Pizza Plant Expansion
When a leader in the frozen pizza market needed to significantly expand their central Wisconsin facility, they turned to Sharpe Engineering for support. Tasked with increasing production capacity to 30 million pizzas annually without compromising quality or efficiency, Sharpe delivered comprehensive project engineering and management solutions.
This project exemplifies Sharpe Engineering’s ability to manage complex, multi-phase expansions with precision and adaptability. From initial scope development to final commissioning, Sharpe delivered innovative engineering solutions that met the client’s immediate needs and prepared them for future success.
Problem
The manufacturer needed to scale production with an efficient system that increased throughput while ensuring quality and compliance with strict food safety standards.
- Capacity Expansion: The facility needed to accommodate new production lines and equipment, expanding from 23 million to 30 million pizzas annually.
- Scope Evolution: Multiple scope adjustments occurred, including changing equipment specifications, adapting production line designs, and integrating additional utility systems.
- Vendor Coordination: Equipment vendor delays and design revisions required agile management to maintain project momentum.
- Infrastructure Complexity: Upgrades to refrigeration systems, utility capacities, and compliance with ammonia safety standards were critical.
Solution
Sharpe Engineering provided end-to-end project management, engineering design, procurement, and vendor coordination to ensure seamless execution.
- Phased Implementation:
- Office expansion and new electric/refrigeration engine rooms.
- Plant expansion and installation of Line 2.
- Reconfiguration of Line 1 and addition of a new holding freezer.
- Installation of Line 3.
- Equipment and Process Layouts: Detailed layouts ensured optimal workflow for production and personnel, accounting for sanitary and operational requirements.
- Production and Equipment Specifications: Developing precise specifications for ingredient preparation, assembly, packaging, and material handling processes.
- Utility and Infrastructure Upgrades: Expanding refrigeration capacity with a transition to ammonia-based systems, upgrading compressed air, and increasing electrical loads.
- Project Management: Budgeting, scheduling, and vendor coordination, including RFP management and bid evaluations.
Engineering Solutions
- Dynamic Scheduling and Coordination: Sharpe Engineering mitigated delays by maintaining close collaboration with vendors and contractors, reworking schedules, and maintaining open communication with the project team.
- Enhanced Design Features: Redesigned production lines to achieve 80% line efficiency with capacity for future growth.
- Compliance Leadership: Ensured adherence to OSHA and EPA standards for ammonia refrigeration systems through safety and management protocols.
- Tailored Layouts: Created phased installation drawings to streamline contractor activities and minimize disruptions to ongoing operation.
Results
The project contributed to a significant boost in production output, efficiency, and operational reliability, reducing bottlenecks and ensuring consistent output.
- Increased Production Capacity: The expansion enabled the facility to produce 30 million pizzas annually, a 30% increase in capacity.
- Operational Flexibility: Modular design allowed phased implementation, ensuring minimal downtime during transitions.
- Cost Management: Delivered within the agreed budget, leveraging a time-and-material, not-to-exceed billing structure.
- Strategic Growth: Positioned the facility to support long-term growth with built-in scalability.